|
Summary of changes
Water System Design Manual
Scroll down to select the highlighted chapter
you want to download. All files require Microsoft Word or
the free Word viewer.
For information on availability of the Design Manual in other
formats please contact
Amy Swecker.
Manual
cover
and table of contents
(downloadable)
|
|
|
|
TABLE OF
CONTENTS
|
|
|
|
CHAPTER &
SECTION
|
CHAPTER & SECTION TITLE
|
PAGE
|
|
|
PREFACE |
|
|
|
GLOSSARY |
|
|
1
|
..........
|
INTRODUCTION
.......................................................................
|
1-1
|
|
|
1.0
|
Purpose and Scope
...................................................................
|
1-1
|
|
|
1.1
|
Applicability
................................................................................
|
1-1
|
|
|
1.2
|
“Must” versus “Should” etc.
........................................................
|
1-2
|
|
|
1.3
|
Relationship with Planning Requirements
.................................
|
1-2
|
|
|
1.4
|
Engineering Requirements
........................................................
|
1-3
|
|
|
1.5
|
General Engineering Project Submittal Requirements ...............
|
1-4
|
|
|
1.6
|
Minimum System Design Requirements
....................................
|
1-4
|
|
|
1.7
|
Sizing Criteria and Water Rights
...............................................
|
1-4
|
|
|
1.8
|
DOH Policies, Procedures and
Guidelines…...............................
|
1-4
|
|
|
1.9
|
Ten States Standards
................................................................
|
1-5
|
|
|
1.10
|
State Environmental Policy Act (SEPA) Considerations ..……..
|
1-5
|
|
|
1.11
|
Other Referenced Documents and Standards
..........................
|
1-5
|
|
2
|
..........
|
PROJECT REPORTS
...............................................................
|
2-1
|
|
|
2.0
|
Relationship to Water System Plan (WSP)
...............................
|
2-1
|
|
|
2.1
|
Submittal to DOH for Review and Approval
..............................
|
2-1
|
|
|
2.2
|
Project Report Contents
............................................................
|
2-1
|
|
3
|
..........
|
CONSTRUCTION DOCUMENTS
..............................................
|
3-1
|
|
|
3.0
|
Relationship to Water System Plan (WSP)
...............................
|
3-1
|
|
|
3.1
|
Submittal to DOH for Review and Approval
...............................
|
3-1
|
|
|
3.2
|
Design Drawings
........................................................................
|
3-2
|
|
|
3.3
|
Project Specifications
................................................................
|
3-3
|
|
|
3.4
|
Change Orders
..........................................................................
|
3-4
|
|
|
3.5
|
Contracted Components for a Project …………………..
...........
|
3-4
|
|
4
|
..........
|
PROCESS FOR REVIEW AND APPROVAL OF PROJECT REPORTS AND CONSTRUCTION
DOCUMENTS
...................
|
4-1
|
|
|
4.0
|
When Documents Required
.......................................................
|
4-1
|
|
|
4.1
|
Coordination with Local Approving Authorities
..........................
|
4-1
|
|
|
4.2
|
Project Report Requirements
....................................................
|
4-1
|
|
|
4.3
|
Project Report and Construction Document Screening and Review
Process
.........................................................................
|
4-2
|
|
|
4.4
|
Submittal Exceptions - Miscellaneous Components and Distribution
Mains
......................................................................
|
4-3
|
|
|
4.5
|
Submittal Exceptions for Distribution-Related Projects
..............
|
4-4
|
|
|
4.6
|
Source Approval and Water Rights
...........................................
|
4-7
|
|
|
4.7
|
Resolution of Disputed DOH Review Decisions
........................
|
4-8
|
|
|
4.8
|
Review Fees and Invoice
..........................................................
|
4-8
|
|
|
4.9
|
Project Approval Letter & Construction Completion ..................
|
4-9
|
|
|
4.10
|
Construction Completion Report (CCR) Forms
.........................
|
4-9
|
|
5
|
..........
|
WATER DEMAND REQUIREMENTS
.......................................
|
5-1
|
|
|
5.0
|
Applicability
...............................................................................
|
5-1
|
|
|
5.1
|
Estimating Demands vs. Actual Use Data
.................................
|
5-1
|
|
|
5.2
|
Residential Water Demand Design Criteria
...............................
|
5-2
|
|
|
5.3
|
Documentation of Water Demand
.............................................
|
5-9
|
|
|
5.4
|
Estimating Nonresidential Water System Demand
....................
|
5-11
|
|
|
5.5
|
Water Demand Forecasting
.......................................................
|
5-16
|
|
|
5.6
|
Other Regulatory Considerations
..............................................
|
5-17
|
|
|
5.7
|
General System Reliability ………………………………………….
|
5-17
|
|
6
|
..........
|
WATER SYSTEM PHYSICAL CAPACITY ANALYSIS (ERUs)
|
6-1
|
|
|
6.0
|
Applicability
................................................................................
|
6-1
|
|
|
6.1
|
Background
................................................................................
|
6-2
|
|
|
6.2
|
Relationship Between System Capacity and Physical Capacity
|
6-2
|
|
|
6.3
|
Fundamental Design Principle for Physical Capacity Analysis ..
|
6-2
|
|
|
6.4
|
The Concept of Equivalent Residential Units (ERUs) ................
|
6-2
|
|
|
6.5
|
Design Factors
...........................................................................
|
6-5
|
|
|
6.6
|
The Relationship Between Physical Capacity and Drinking Water
Operating Permits (Chapter 246-294 WAC)
...................
|
6-6
|
|
|
6.7
|
Methodology to Determine System Physical Capacity
...............
|
6-6
|
|
7
|
..........
|
SOURCE OF SUPPLY
..............................................................
|
7-1
|
|
|
7.0
|
Water Resource Analysis and Water Rights
…………………….
|
7-1
|
|
|
7.1
|
Source Water Quantity
……………………………………………..
|
7-2
|
|
|
7.2
|
Source Water Quality and Protection
…………………………….
|
7-3
|
|
|
7.3
|
Ground Water Sources (Wells)
……………................................
|
7-6
|
|
|
7.4
|
Spring Sources
……………………………………………………...
|
7-9
|
|
|
7.5
|
New Surface Water Supplies
……………………………………...
|
7-11
|
|
|
7.6
|
Interties
......................................................................................
|
7-11
|
|
|
7.7
|
General Reliability Considerations ………………………………..
|
7-12
|
|
|
7.8
|
General Source Considerations
…………………………………..
|
7-12
|
|
8
|
..........
|
TRANSMISSION AND DISTRIBUTION MAIN DESIGN
...........
|
8-1
|
|
|
8.0
|
Transmission and Distribution Main Definitions
.........................
|
8-1
|
|
|
8.1
|
System Distribution Facility Sizing
.......……………....................
|
8-1
|
|
|
8.2
|
Hydraulic Analysis
.....................................................................
|
8-4
|
|
|
8.3
|
Materials
....................................................................................
|
8-12
|
|
|
8.4
|
General Design Consideration for Mains
...................................
|
8-13
|
|
|
8.5
|
Appurtenant Design Considerations
..........................................
|
8-14
|
|
|
8.6
|
Layout of Mains
.........................................................................
|
8-16
|
|
|
8.7
|
Detail Drawings
..........................................................................
|
8-17
|
|
|
8.8
|
Standard Construction Specifications
........................................
|
8-17
|
|
|
8.9
|
Cross-Connection Protection
.....................................................
|
8-19
|
|
|
8.10
|
Chapter 8 References
................................................................
|
8-19
|
|
9
|
..........
|
RESERVOIR DESIGN AND STORAGE VOLUME
...................
|
9-1
|
|
|
9.0
|
Storage Volume Components
...................................................
|
9-1
|
|
|
9.1
|
Reservoir Sizing Considerations
...............................................
|
9-7
|
|
|
9.2
|
Establishing Overflow Elevation
................................................
|
9-9
|
|
|
9.3
|
System Pressure Considerations
..............................................
|
9-10
|
|
|
9.4
|
Site Feasibility Considerations
..................................................
|
9-11
|
|
|
9.5
|
Special Design Considerations Based on Type of Reservoir ....
|
9-11
|
|
|
9.6
|
Reservoir Appurtenant Design
...................................................
|
9-13
|
|
|
9.7
|
Operational Constraints and Considerations
.............................
|
9-15
|
|
|
9.8
|
Reservoir Structural Design
.......................................................
|
9-16
|
|
10
|
..........
|
BOOSTER PUMP STATION (BPS) DESIGN
............................
|
10-1
|
|
|
10.0
|
Select Applicable Booster Pump Station Type
..........................
|
10-1
|
|
|
10.1
|
Determination of Pumping System Discharge Capacity Requirements ……………………………………………………….
|
10-2
|
|
|
10.2
|
Hydraulic Design Requirements for Supplying System
.............
|
10-4
|
|
|
10.3
|
Mechanical Design Considerations
...........................................
|
10-5
|
|
|
10.4
|
BPS Appurtenant Design
..........................................................
|
10-5
|
|
|
10.5
|
Back-up Power Requirements for Closed System BPS
............
|
10-7
|
|
|
10.6
|
BPS Structural Design
...............................................................
|
10-8
|
|
|
10.7
|
Multiple Pump Design Considerations
.......................................
|
10-8
|
|
11
|
..........
|
HYDROPNEUMATIC (PRESSURE) TANKS
............................
|
11-1
|
|
|
11.0
|
General
......................................................................................
|
11-1
|
|
|
11.1
|
Pressure Tank Sizing Procedure
...............................................
|
11-1
|
|
|
11.2
|
Requirements of the Department of Labor & Industries
……….
|
11-6
|
|
|
11.3
|
Locating Pressure Tanks
...........................................................
|
11-7
|
|
|
11.4
|
Piping
.........................................................................................
|
11-7
|
|
|
11.5
|
Pressure Tank Appurtenances
..................................................
|
11-7
|
|
|
|
|
|
|
|
11.6
|
Hydropneumatic Tank Sizing Associated with “Cycle
Stop Valves”
..............................................................................
|
11-7
|
|
12
|
..........
|
WATER QUALITY AND TREATMENT
.....................................
|
12-1
|
|
|
12.0
|
Applicability
................................................................................
|
12-1
|
|
|
12.1
|
Submittal Requirements
.............................................................
|
12-1
|
|
|
12.2
|
Treatment Alternatives
...............................................................
|
12-1
|
|
|
12.3
|
Analysis of Alternatives
..............................................................
|
12-14
|
|
|
12.4
|
Evaluation Studies (Reference WAC 246-290-250)
…………....
|
12-17
|
|
|
12.5
|
Project Report and Final Design Considerations
.......................
|
12-22
|
|
|
12.6
|
Construction Documents (Reference WAC 246-290-120)
.........
|
12-26
|
|
|
12.7
|
Start-up, Testing, and Operation
...............................................
|
12-28
|
|
|
12.8
|
Related Policies and Guidelines
................................................
|
12-28
|
|
|
12.9
|
Cross-Connection Control Considerations in Water
Treatment Facilities
....................................................................
|
12-28
|
|
|
12.10
|
Chapter 12 References
..............................................................
|
12-32
|
|
13
|
..........
|
MISCELLANEOUS DESIGN CONSIDERATIONS
....................
|
13-1
|
|
|
13.1
|
Safety
........................................................................................
|
13-1
|
|
|
13.2
|
Protection from Trespassers
.....................................................
|
13-4
|
|
|
13.3
|
Heat Exchangers
.......................................................................
|
13-4
|
|
|
13.4
|
Cross-Connection Control Protection
........................................
|
13-4
|
|
|
13.5
|
Seismic Design
..........................................................................
|
13-8
|
|
14
|
..........
|
CONSTRUCTION INSPECTION AND FINAL APPROVAL
......
|
14-1
|
|
|
14.1
|
Construction Report Form
.........................................................
|
14-1
|
|
|
14.2
|
Water Facilities Inventory (WFI) Form
.......................................
|
14-1
|
|
|
14.3
|
Pressure and Leakage Test
......................................................
|
14-1
|
|
|
14.4
|
Disinfection
................................................................................
|
14-2
|
|
|
14.5
|
Disposal of Chlorinated Water and Dechlorination Process ......
|
14-2
|
|
|
14.6
|
Microbiological Test
...................................................................
|
14-3
|
|
|
14.7
|
Pipelines
....................................................................................
|
14-3
|
|
|
14.8
|
Storage Reservoirs
....................................................................
|
14-3
|
|
|
14.9
|
Pumps and Controls
..................................................................
|
14-4
|
|
|
14.10
|
Treatment Systems
....................................................................
|
14-4
|
|
|
14.11
|
Change Orders
……………………............................................
|
14-4
|
|
|
14.12
|
Documentation When No DOH Approval Required
...................
|
14-5
|
|
|
14.13
|
Record Drawings
.......................................................................
|
14-5
|
|
|
|
|
|
|
|
|
APPENDICES
|
|
|
A
|
List of DOH Drinking Water Policies and Procedures (contact our
office) |
|
|
B
|
Copies of Selected Guidelines or Policies Referenced in the Water
System Design Manual |
|
|
C
|
List of Agencies and Publications Referenced in the Water System
Design Manual |
|
|
D
|
Background and Development of Residential Water Demand vs.
Precipitation |
|
|
E
|
Recommended Pumping Test Procedures |
|
|
F
|
Obtaining Approval for Wells as Public Drinking Water Sources |
|
|
G
|
Additional Water Treatment Guidance Documents |
|
|
H
|
Guidance for Leachable Contaminant Testing Procedures |
|
|
I
|
Ultraviolet Light Disinfection for Drinking Water Applications
Appendix I Attachment |
|