|
Summary
of changes
Water System Design Manual
Scroll down to select the
highlighted chapter you want to download. All files require Microsoft Word or the free Word
viewer. For information on availability of the Design
Manual in other formats please contact
Amy Swecker.
The complete Manual can be
downloaded in Word with this self-extracting file (design_manual.exe).
Manual cover
and table of contents (downloadable)
|
|
|
|
TABLE OF
CONTENTS
|
|
|
|
CHAPTER
&
SECTION
|
CHAPTER
& SECTION TITLE
|
PAGE
|
|
|
PREFACE |
|
|
|
GLOSSARY |
|
|
1
|
..........
|
INTRODUCTION
.......................................................................
|
1-1
|
|
|
1.0
|
Purpose
and Scope ...................................................................
|
1-1
|
|
|
1.1
|
Applicability
................................................................................
|
1-1
|
|
|
1.2
|
“Must”
versus “Should” etc. ........................................................
|
1-2
|
|
|
1.3
|
Relationship
with Planning Requirements .................................
|
1-2
|
|
|
1.4
|
Engineering
Requirements ........................................................
|
1-3
|
|
|
1.5
|
General
Engineering Project Submittal Requirements ...............
|
1-4
|
|
|
1.6
|
Minimum
System Design Requirements ....................................
|
1-4
|
|
|
1.7
|
Sizing
Criteria and Water Rights ...............................................
|
1-4
|
|
|
1.8
|
DOH
Policies, Procedures and
Guidelines…...............................
|
1-4
|
|
|
1.9
|
Ten
States Standards ................................................................
|
1-5
|
|
|
1.10
|
State
Environmental Policy Act (SEPA) Considerations ..……..
|
1-5
|
|
|
1.11
|
Other
Referenced Documents and Standards
..........................
|
1-5
|
|
2
|
..........
|
PROJECT
REPORTS
...............................................................
|
2-1
|
|
|
2.0
|
Relationship
to Water System Plan (WSP) ...............................
|
2-1
|
|
|
2.1
|
Submittal
to DOH for Review and Approval
..............................
|
2-1
|
|
|
2.2
|
Project
Report Contents ............................................................
|
2-1
|
|
3
|
..........
|
CONSTRUCTION
DOCUMENTS
..............................................
|
3-1
|
|
|
3.0
|
Relationship
to Water System Plan (WSP) ...............................
|
3-1
|
|
|
3.1
|
Submittal
to DOH for Review and Approval
...............................
|
3-1
|
|
|
3.2
|
Design
Drawings ........................................................................
|
3-2
|
|
|
3.3
|
Project
Specifications ................................................................
|
3-3
|
|
|
3.4
|
Change
Orders ..........................................................................
|
3-4
|
|
|
3.5
|
Contracted
Components for a Project …………………..
...........
|
3-4
|
|
4
|
..........
|
PROCESS
FOR REVIEW AND APPROVAL OF PROJECT REPORTS AND CONSTRUCTION
DOCUMENTS
...................
|
4-1
|
|
|
4.0
|
When
Documents Required .......................................................
|
4-1
|
|
|
4.1
|
Coordination
with Local Approving Authorities
..........................
|
4-1
|
|
|
4.2
|
Project
Report Requirements ....................................................
|
4-1
|
|
|
4.3
|
Project
Report and Construction Document Screening and Review Process
.........................................................................
|
4-2
|
|
|
4.4
|
Submittal
Exceptions - Miscellaneous Components and Distribution Mains
......................................................................
|
4-3
|
|
|
4.5
|
Submittal
Exceptions for Distribution-Related Projects
..............
|
4-4
|
|
|
4.6
|
Source
Approval and Water Rights ...........................................
|
4-7
|
|
|
4.7
|
Resolution
of Disputed DOH Review Decisions
........................
|
4-8
|
|
|
4.8
|
Review
Fees and Invoice ..........................................................
|
4-8
|
|
|
4.9
|
Project
Approval Letter & Construction Completion ..................
|
4-9
|
|
|
4.10
|
Construction
Completion Report (CCR) Forms .........................
|
4-9
|
|
5
|
..........
|
WATER
DEMAND REQUIREMENTS
.......................................
|
5-1
|
|
|
5.0
|
Applicability
...............................................................................
|
5-1
|
|
|
5.1
|
Estimating
Demands vs. Actual Use Data .................................
|
5-1
|
|
|
5.2
|
Residential
Water Demand Design Criteria ...............................
|
5-2
|
|
|
5.3
|
Documentation
of Water Demand .............................................
|
5-9
|
|
|
5.4
|
Estimating
Nonresidential Water System Demand
....................
|
5-11
|
|
|
5.5
|
Water
Demand Forecasting .......................................................
|
5-16
|
|
|
5.6
|
Other
Regulatory Considerations ..............................................
|
5-17
|
|
|
5.7
|
General
System Reliability ………………………………………….
|
5-17
|
|
6
|
..........
|
WATER
SYSTEM PHYSICAL CAPACITY ANALYSIS (ERUs)
|
6-1
|
|
|
6.0
|
Applicability
................................................................................
|
6-1
|
|
|
6.1
|
Background
................................................................................
|
6-2
|
|
|
6.2
|
Relationship
Between System Capacity and Physical Capacity
|
6-2
|
|
|
6.3
|
Fundamental
Design Principle for Physical Capacity Analysis ..
|
6-2
|
|
|
6.4
|
The
Concept of Equivalent Residential Units (ERUs) ................
|
6-2
|
|
|
6.5
|
Design
Factors ...........................................................................
|
6-5
|
|
|
6.6
|
The
Relationship Between Physical Capacity and Drinking Water Operating
Permits (Chapter 246-294 WAC) ...................
|
6-6
|
|
|
6.7
|
Methodology
to Determine System Physical Capacity
...............
|
6-6
|
|
7
|
..........
|
SOURCE
OF SUPPLY
..............................................................
|
7-1
|
|
|
7.0
|
Water
Resource Analysis and Water Rights
…………………….
|
7-1
|
|
|
7.1
|
Source
Water Quantity ……………………………………………..
|
7-2
|
|
|
7.2
|
Source
Water Quality and Protection …………………………….
|
7-3
|
|
|
7.3
|
Ground
Water Sources (Wells) ……………................................
|
7-6
|
|
|
7.4
|
Spring
Sources ……………………………………………………...
|
7-9
|
|
|
7.5
|
New
Surface Water Supplies ……………………………………...
|
7-11
|
|
|
7.6
|
Interties
......................................................................................
|
7-11
|
|
|
7.7
|
General
Reliability Considerations ………………………………..
|
7-12
|
|
|
7.8
|
General
Source Considerations …………………………………..
|
7-12
|
|
8
|
..........
|
TRANSMISSION
AND DISTRIBUTION MAIN DESIGN
...........
|
8-1
|
|
|
8.0
|
Transmission
and Distribution Main Definitions
.........................
|
8-1
|
|
|
8.1
|
System
Distribution Facility Sizing .......……………....................
|
8-1
|
|
|
8.2
|
Hydraulic
Analysis .....................................................................
|
8-4
|
|
|
8.3
|
Materials
....................................................................................
|
8-12
|
|
|
8.4
|
General
Design Consideration for Mains
...................................
|
8-13
|
|
|
8.5
|
Appurtenant
Design Considerations ..........................................
|
8-14
|
|
|
8.6
|
Layout
of Mains .........................................................................
|
8-16
|
|
|
8.7
|
Detail
Drawings ..........................................................................
|
8-17
|
|
|
8.8
|
Standard
Construction Specifications ........................................
|
8-17
|
|
|
8.9
|
Cross-Connection
Protection .....................................................
|
8-19
|
|
|
8.10
|
Chapter
|